Baumfolder Gatefold Manual do Utilizador Página 1

Consulte online ou descarregue Manual do Utilizador para Hardware Baumfolder Gatefold. Baumfolder Gatefold User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 12
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Pneumatic Gatefold Installation Instructions
For
Baum 2018, 2020 Pile & Continuous Feed Folder
models
This manual is a supplement to the operating manual. It is to be used for initial installation by a
Baum authorized field technician. For actual setup and operation of the gatefold, see the
operator’s manual.
© Baumfolder Corporation., Printed in USA TP10407
Vista de página 0
1 2 3 4 5 6 ... 11 12

Resumo do Conteúdo

Página 1

Pneumatic Gatefold Installation Instructions For Baum 2018, 2020 Pile & Continuous Feed Folder models This manu

Página 3

Send test samples and look for inside “dog ears” or damaged edges to the inside edges. These are a signal that the timing needs to be adjusted. Do not

Página 4

1-800 543-6107 Baumfolder Corporation 1660 Campbell Rd. Sidney, OH 45365 12

Página 5

Inspect shipment carefully for any damage immediately. If freight damage occurs, contact the freight carrier immediately. Do not discard crating mate

Página 6

1. Install mounting post to feeder frame on the non-operator side of the folder. Drill (2) ¼ inch or 6.5mm diameter clearance holes in the frame as sh

Página 7 - Setting up a Job to test

4. Remove wire #13L1 from the side of Auxiliary contact block K2. Move this wire up to the open side of terminal 12L1 on the terminal strip TB-1.

Página 8

7. Install the gatefold foldplate in the #4 foldplate position. Make sure that there is no interference. Turn the handwheel on the folder to check. If

Página 9

To set the control panel readout for proper machine size and language, perform the following: 1. Press the main power button in the lower left-hand

Página 10

Setting up a Job to test. It is important to set up a gatefold job (1) step at a time. Work from the feeder forward. Make your setup procedure the

Página 11

4. Reinstall foldplate #2 and have it set to deflect the paper. Leave #4 position open without a foldplate. Set foldplate #3 open to folding to make

Comentários a estes Manuais

Sem comentários